Street Closure/Detour Information

Print

CURRENT STREET WORK

 

++++++++++ CITY-WIDE CONSTRUCTION+++++++++

CP 16-01 CITY-WIDE PAVEMENT REHABILITATION
August 2016 - January 2017

Annual pavement rehabilitation of city streets. There may be significant
time gaps between milling, paving, and striping of roadways.
It is more cost effective for contractor to do all phases of work
throughout the city at one time.

Please note Contractor's notification dates and times for work in your area
and schedules can change at any time due to weather, special events,
or circumstances beyond the contractor’s control. 

January 3, 2017
PULVERIZE - Sunny Dunes Road (El Cielo to Desert Way)
DEMO & FORM ADA RAMPS - El Cielo Road (Aviation Way to Tahquitz Cyn Way)

January 4, 2017
PULVERIZE - El Cielo Road (Aviation Way to Tahquitz Cyn Way)
FORM & POUR ADA RAMPS - El Cielo Road (Aviation Way to Tahquitz Cyn Way)

January 5, 2017
PULVERIZE - El Cielo Road (Aviation Way to Tahquitz Cyn Way)
EXCAVATE - Sunny Dunes Road (El Cielo to Desert Way)
FORM & POUR ADA RAMPS - El Cielo Road (Aviation Way to Tahquitz Cyn Way)

January 6, 2017
EXCAVATE - El Cielo Road (Aviation Way to Tahquitz Cyn Way)
PAVE - Rim Road (Bisnaga Avenue to Southridge Road)

January 10, 2017
WEED KILL - Proposed Overlay Streets

January 11, 2017
PAVE - Sunny Dunes Road (El Cielo to Desert Way)

January 12, 2017
NO WORK

January 13, 2017
PAVE - El Cielo Road (Aviation Way to Tahquitz Cyn Way)
SKIP STRIPE - Sunny Dunes Road (El Cielo to Desert Way)

For all calls, complaints, information requests etc., 
please call the project hotline number: 1-562-463-4464

CP 16-01 ROADWAY REHABILITATION WORK ON EL CIELO BETWEEN
TAHQUITZ CANYON WAY AND AVIATION ROAD

 January 2, 2017 - January 13, 2017

 Road Work on El Cielo between Tahquitz Canyon Way and Aviation Road will commence beginning the first week of January 2017

  • Please avoid the area if possible and heed construction signs and detours
  • Street parking and access to City Hall will be limited along El Cielo, please use access on Civic Drive

 Tentative Schedule, weather permitting, is as follows:

January 3rd  (Tuesday):  Utility adjustments

January 4th – 6th:  Pulverization and Rough Grading

January 9th-13th:  Fine Grading and Asphalt Paving

*****OBEY ALL TRAFFIC CONTROL SIGNS AND EXPECT DELAYS  *****

 

++++++++PS AIRPORT ROAD MAINTENANCE++++++

LANE CLOSURES OF KIRK DOUGLAS WAY

Over the next 2-3 weeks, beginning 12/5/16, various sections of Kirk Douglas Way (KDW) will be closed for maintenance. KDW will be passable (either direction) as only one lane will be close at any one time. For questions or concerns, call 760-318-3845.

*****OBEY ALL TRAFFIC CONTROL SIGNS AND EXPECT DELAYS  *****

 

++++++++DWA CONSTRUCTION++++++

NO ROAD CLOSURES

 

++++++++++SOCAL GAS CONSTRUCTION+++++++++ 

SOCAL GAS CONSTRUCTION WITHIN
SOUTH PALM SPRINGS NEIGHBORHOODS
September 2016 - February 2017 - Monday-Friday - 7:00am - 4:00pm

Service installation and main line replacements by SoCal Gas within
South Palm Canyon, Murray Canyon, Bogert Trail, and Toledo Avenue. Intermittent lane
closures and detours during construction.
For Questions and Concerns, contact SoCal Gas at (800) 427-2200, 24/7 

 

*****OBEY ALL TRAFFIC CONTROL SIGNS AND EXPECT DELAYS  *****

  


++++++++++ DOWNTOWN CONSTRUCTION+++++++++

NORTH PALM CANYON WAY LANE CLOSURE
BETWEEN AMADO ROAD & ANREAS ROAD
 
December 7, 2015 12:00pm thru December 2016 -> 24/7

Lane 3 SOUTHBOUND will be closed due to construction from
Andreas Road to Main Street. Lanes 1 & 2 southbound will remain open.
ALL Lanes will be open the following morning.

*****OBEY ALL TRAFFIC CONTROL SIGNS AND EXPECT CONGESTION*****

 

SPA CASINO PARKING STRUCTURE CONSTRUCTION
Amado Road between Calle Encilia and Calle El Segundo
August 2016 - April 2017

Portions of sidewalk along Calle El Segundo and Amado Road
will be CLOSED to pedestrian traffic during construction.

*****OBEY ALL PEDESTRIAN CONTROL SIGNS AND USE NEW PARKING LOT
AND ENTRANCE ON SOUTH SIDE OF CASINO *****

 

CURRENT SPECIAL EVENTS

+++++++SPECIAL EVENTS ROAD CLOSURES+++++++

 

PALM SPRINGS VILLAGE FEST

Palm Canyon Drive is CLOSED every THURSDAY
6:00pm - 10:00 pm

from Amado Road- Baristo Road.

<<<<<<<END>>>>>>

 

Want to get traffic and weather alerts during commute time
and on the weekends? Sign up for Nixle Alerts. It's easy and FREE!

 NIXLE logo 

LATEST WEATHER CONDITIONS

Click HERE  for the latest weather conditions.

EXTERNAL LINKS

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer